Email

Five step installation process

Decking - Step 1 Removal of
existing structures

We will remove and dispose of anything that was previously on the site of your proposed decking – including old patios, trees and shrubs or any existing decking.

Decking - Step 1 Preparation of
area

The area to be decked is thoroughly cleared. Preparation includes the laying of a breathable membrane that will prevent weeds growing underneath your new decking.

Decking - Step 3 Framework and
foundations

Strong and stable foundations are laid if necessary, and sturdy timber frameworks are embedded in hard curing concrete to provide a stable base.

Decking - Step 4 Installation of decking
and handrails

Responsibly sourced timber decking is laid, with additional features such as handrails, steps and LED lighting. Optional painting and varnishing for a polished finish.

Decking - Step 5 Leave a tidy
site

We pride ourselves on being tidy tradespeople. We always leave our worksites looking immaculate.

Hand-built decking

We design decking to fit your house and garden - taking into account any awkward corners, slopes and gradients to create a stable flat platform that can be enjoyed for years to come.

All decking installations come with weed dampening and anti-slip features, and your choice of wood stain colour. Let us know if you are interested in our hand-built decking and we’ll come to your property to measure up and deliver your free quotation within 24 hours.

Decking gallery

Take a look at some different decking structures we’ve installed. If you see something you like, you can reference the image code when describing to us what you want.