Norfolk Prestige Fencing Ltd

Our Five-Step Installation Process

All of our decking installations follow the same five-step installation process. This ensures that every job is completed to the same high standard.

Decking Process Step 1

Removal and disposal of existing structures

We will remove and dispose of anything that was previously on the site of your proposed decking – including old patios, trees and shrubs or any existing decking.

Decking Process Step 2

Preparation of
area

The area to be decked is thoroughly cleared. Preparation includes the laying of a breathable membrane that will prevent unwanted and ugly weeds poking up through your decking.

Decking Process Step 3

Framework
Installation

The sturdy skeleton of your decking will be embedded in hard curing ready-mix concrete.

Decking Process Step 4

Installation of decking
and handrails

We only use treated timber that increases the life of your decking. Treated timber will last a lot longer than untreated timber.

Decking Process Step 5

Leave a tidy
site

The job is only completed when we have tidied up after ourselves.

Other Services